How Long Does a 5×8 Bathroom Remodel Take? (Timeline and Steps)

bathroom remodel

introduction

Remodeling your bathroom is one of the most lucrative home improvement projects that you can take up. It enhances functionality, adds charm, and increases the comfort of the room. While a typical 5×8 bathroom remodel takes around two to four weeks, it’s important to remember that there are several factors that influence the timeline. If you’re interested in learning how long a 5×8 bathroom remodel takes, this blog goes over everything from the designing to the rough-ins to the final inspection and everything else in between.

From Concept To Completion: The Time It Takes To Renew Your 5×8 Bathroom.

While giving your forty square foot bathroom a makeover is a fun little way to add to the value of your property, sometimes the wait can get to the homeowners. Whether it’s your own bathroom you’re planning to update, or you’re doing research for a friend, let’s go through a typical timeline together.

Here is a look at how long a typical bathroom makeover would take.

  • Planning & Designing (A Few Weeks)

The first thing you’ll need to do is to plan out your project. This includes deciding how much you want to change, picking fixtures, and even deciding on the accessories. If you’re changing the layout, consulting with a designer, and getting your project approved will all take four to six weeks or more.

  • Demolition (1-3 Days)

Once they’re ready to begin, your contractors will start by stripping your bathroom of its current fixtures, flooring, and even wall tiles if that’s what you want. The total demolition phase will take one to three days, depending on the extent of the strip.

  • Plumbing & Electrical Rough-Ins (2-4 Days)

The contractors will take a few days to lay down the new pipes and reroute the wiring. Again, the timeframe for this phase depends on how much you want to change during your bathroom makeover.

  • Rough-In inspections (1 Day)

Now that everything’s in place, it’s time for the inspection. Passing it is important to adhere to safety and building codes. This step only takes a day before construction can truly begin.

  • Drywall Installation & Painting (2 Days)

Now that the cables and pipes have been inspected, it’s time to cover them all up. Your bathroom remodelers will install the drywall next, followed by painting it. Once the paint’s dried, they’ll move on to the floors.

  • Floor Installation (3-4 Days)

Now for the floors. The remodeling team will first waterproof the floors, followed by the new tiles. In case there’s a walk-in shower, they will also tile it along with the shower panels. This step will take around two to three days.

  • Fixture Installation (2 Days)

Okay, now it’s time to put the new fixtures in. Your contractors will set up your toilet, the vanity, and even the shower in this step. Depending on how much they have to add and connect to the plumbing and electrical, this step takes about two days at most.

  • Finishing Touches (1 Day)

Finally, it’s time for the finishing touches. Any cabinets you wanted will be put up along with towel rods and toilet paper holders. Once you’ve approved of everything, your 5×8 bathroom remodel is officially complete!

Things Influencing The Duration Of A 40SQFT Bathroom Remodel: Materials, Permits & More

Still with us? Awesome! Now, it’s important to keep in mind that while a typical bathroom remodel does take around one month for a complete makeover, there are a few things that can slow down the timeline. Just take the lead time with a grain of salt and be prepared for the following things when scheduling your remodel:

  • Delivery Delays: You might have placed your orders on time, but there can be delays at customs or in production, which can set back your project.
  • Inclement Weather: There’s no fighting a blizzard or hurricane. So if that’s what happens during your project, be prepared for delays.
  • Holidays: If events like July 4 fall during your remodel, you’ll have to wait for your project to be completed.
  • Unforeseen Issues: If your team comes across water damage as they work, fixing it is going to add a few more days.

Conclusion

To conclude, a typical 5×8 bathroom remodel takes about a month to complete, with minor renovations usually taking around two weeks. At SoCal Renovations, the majority of the time is spent in the planning phase deciding on themes, project scope, and material choices. Demolition typically takes only two days, followed by the rest of the construction, which takes a few weeks. Keep in mind that factors like material availability and holidays can extend the lead time. We hope this blog helped answer your question about how long a 5×8 remodel takes. For more details, don’t hesitate to reach out to SoCal Renovations!

FAQs

How do I open up a small bathroom?

Swap out the bathtub for a walk-in shower and go for large tiles in light colors to open it up.

How far in advance should I book my bathroom remodel?

You should book it at least three to six months in advance for a smooth project.

Can I stay in my house during a 5×8 bathroom remodel?

If you don’t mind the dust and noise, you can stay at your house during the remodel.